Re-capture Required
Admin has flagged specific steps for re-capture. See the checklist below for details.
Warehouse Unit
Plot 44 Lekki FTZ · property
Asset
Type: property
Description: Warehouse Unit
Identifier: Plot 44 Lekki FTZ
Location
12 Admiralty Way, Lekki Phase 1
2.4 km · ~8 min drive
NavigateCustomer
Hassan Yusuf
+234 806 •••• ••16
Customer contact info is logged for audit. Only use for this assignment.
Verification Method
In-Person Inspection
You'll go on-site and capture the evidence yourself using the capture flow on your device.
Capture Checklist
10 steps · Est. 17 min
Building exterior — front
Capture the front facade and full elevation.
~14s · video
Building exterior — sides/rear
Capture side walls and rear condition.
~16s · video
Roof visibility
Capture visible roof condition (or elevated angle).
~12s · video
Interior — main spaces
Walk through main rooms/workspaces slowly.
~45s · long-video
Interior — kitchen / utility
Capture utility/kitchen and service areas.
~20s · video
Electrical panel / wiring
Capture electrical board and visible wiring sections.
~14s · video
Fire safety systems
Capture extinguishers, alarms, sprinklers if available.
~14s · video
Security systems
Capture locks, fencing, CCTV, and entry points.
~14s · video
Surrounding environment
Capture neighboring structures and access roads.
~14s · video
Specific damage areas
Capture any claim-related damage sections in detail.
~40s · long-video
Notes from Admin
Customer reported front-end damage from minor accident.